The system can achieve multi-layer test and water exploration and shutoff. It can deploy any production layer to work, reducing water cycling between oil and water well, making cost down and improving pumping efficiency. It is significant to oil and gas mineral development and exploration.
★ Features:
★ Technical Parameter:
- Working environmental temperature: 0-125℃
- Pressure range: 0-40Mpa
- Pressure accuracy: ≤0.1%F•S
- Temperature resolution: ≥0.1℃
- No. of working layer: 6
- Continuous working time: ≥365 days
- Power supply: AC 220V,50HZ
- Switch output torque: ≥80000g.cm
- Dimension: φ107×2700mm
- Downhole communication distance:<5000m
★ Software management
Management Software at PC Centre
At present, the instrument has been applied in Daqing Oil Field and Liaohe Oil Field, achieving good results. |